Hi,
I seem to be unable to cancel jobs that are scheduled for the future. e.g. if I set a Shutdown to be triggered 8 hours from now...then manually closed my server now I have no way to bring it back up again. I get an error that Job Currently In Progress (i.e. the pending shutdown job).
So I was forced to wait 8 hours before I could get back on my server...oops.
Also, being able to hybernate / standby and then use a WakeOnLan packet to instantly power back on my server would be pretty cool (or some other way to remotely power it back on instantly).
Rgds
Andy
I seem to be unable to cancel jobs that are scheduled for the future. e.g. if I set a Shutdown to be triggered 8 hours from now...then manually closed my server now I have no way to bring it back up again. I get an error that Job Currently In Progress (i.e. the pending shutdown job).
So I was forced to wait 8 hours before I could get back on my server...oops.
Also, being able to hybernate / standby and then use a WakeOnLan packet to instantly power back on my server would be pretty cool (or some other way to remotely power it back on instantly).